Existing Assets
Existing Assets and Reference Background
What is already defined and documented — and, kept separate, the industry experience it is built on.
01 — Existing IPPA assets
What has been produced inside IPPA.
Architecture, model, requirements and scenarios. Each item carries its stage and the owner of the information.
The operational model, layers and their relationships, written down as a specification.
Owner — IPPA 11
The reference functional model, its responsibilities and the boundaries between centres.
Owner — IPPA 11
Documented functional requirements for the modules the MVP is to contain.
Owner — IPPA 11
Written execution scenarios, roles, approvals and verification points.
Owner — IPPA 11
The Denmark coordination scenario, described end to end with its metrics.
Owner — IPPA 11
Management and project material produced while preparing the first industry.
Owner — IPPA 11
Collected standards, methods and libraries intended to seed the scenario library.
Owner — IPPA 11
Confirmed rights over the architecture and methodology. Registrations are in progress.
Owner — Baltic House RE OÜ
A clickable product interface does not yet exist, so it is not listed here as an asset. It belongs to the next milestone.
02 — Reference industry background
The experience it is built on.
Real projects and partner-company practice that existed before IPPA.
A standardised eco-house product with its own delivery practice and supplier base.
Source — NORDSOLD
Practical development work across the eco-building lifecycle.
Source — partner companies
Completed architectural work carried out before IPPA existed.
Source — partner architects
Site delivery, assembly and quality-control practice.
Source — partner companies
Modelling practice and the engineering rules behind the standardised products.
Source — partner engineers
Supplier relationships, pricing structures and material specifications.
Source — partner companies
Manufacturing routes and assembly sequences for standardised elements.
Source — partner companies
Market, site and regulatory groundwork for the first validation scenario.
Source — partner companies
These projects and materials form the industry and knowledge foundation for IPPA. They are not presented as results produced by an already operational IPPA Core.
See the development roadmap
How these assets are turned into a working MVP and a first pilot.